What Is the Company Summary Dashboard?
The Company Summary Dashboard is a single, company-wide view of financial and operational health across all your work. Spot trends and outliers at a glance, then jump into the detailed dashboards for the full story.
Most contractors run more than one kind of work at once: one-off service calls, service agreements with scheduled maintenance, and construction projects. Each has its own billing, its own costs, and its own margin, so getting one picture of the business usually means pulling numbers from several reports or waiting for month-end financials. This dashboard puts that picture on one screen: what you've billed, what it cost, how profitable each line of work is, how your sales pipeline is moving, and how your field team is performing.
The page has five sections, 19 headline tiles, and 3 charts. When you want to see which jobs, customers, or projects are behind a number, every tile points you to the Finance or Operations dashboard that holds the detail.
If you used the legacy Landing Page KPIs, this is where they live now. See Where did my legacy report go? for the full map.
Where to find it
Go to Dashboard. The Dashboard Hub is the landing page and lists all of the Standard Dashboards. On the Company Summary card, click View. Hover over the ⓘ on the card for a one-line description.
You can also pick it from the Dashboards dropdown (top right), where all the Standard Dashboards are grouped under New Standard.
Dashboard Hub showing the Company Summary card and its ⓘ description
💡 Tip: Every tile has a small ⓘ. Tap it to see what the number includes, how it's calculated, and where to find the detail.
Who Uses It
Heads up on data freshness: This dashboard refreshes approximately every 15 minutes. Depending on when a change lands in the data pipeline, it can occasionally take longer, up to about an hour. It is not a live feed. Check the Last Data Refresh timestamp in the header before acting on the numbers.
⚠️ This is an operational view, not your accounting books.
The numbers are built from what is recorded in BuildOps. Your accounting system (QuickBooks, Intacct, Vista, Spectrum, and so on) remains your system of record.
If you're responsible for how the business is performing at any level, this dashboard is for you. Here's how you'll use it depending on your role:
Role | How You'll Use It |
Owner / Executive | Get the quick "how are we doing?" read: billings, cost, gross profit, and margin for the whole company, then drill into whatever looks off. |
VP / Operations Leader | Compare margin across service jobs, service agreements, maintenance, and projects to see which line of work is carrying the business. Watch labor utilization and cycle times. |
Controller / Finance | Check company-wide billings, cost, and gross profit, and use each tile's info box to trace a number back to the Finance Dashboard. |
Project Manager | Use Project Margin % and the Project Margin by Department chart to see how projects are performing and which departments are above or below the overall project margin. |
Service Manager | Watch Service Job Margin, Job Efficiency, Jobs Completed, and the cycle-time tiles to see how quickly jobs move from created to completed to invoiced. |
Sales / Estimating Lead | Track the Sales & Quote Pipeline: approved quote dollars, approved and pending counts, win rate, and where quotes sit in the funnel. |
What's on the Page
The dashboard is one page, Company Overview, organized into five sections. Each section has its own row of tiles, and three of them include a chart.
Section | Tiles | Chart |
Financial Performance | Total Cost, Total Billings (Pre-Tax), Gross Margin %, Gross Profit | Total Billed Pre Tax (Dept) by Department |
Profitability by Line of Business | Service Job Margin %, SA Margin %, Maintenance Margin %, Project Margin % | Project Margin by Department |
Sales & Quote Pipeline | Total Quoted Amount Approved, # Quotes Approved, # Quotes Pending, Win/Acceptance Rate | Quote Status Funnel |
Operations & Productivity | Total Actual Labor Hours, Avg Labor Utilization Rate, Avg Job Efficiency, # Jobs Completed | None |
Cycle Times & Efficiency | Avg Days to Job Completion, Avg Job Closeout Efficiency, Avg Job Billing Efficiency | None |
The header
Element | What It Does |
Logo and account name | Shows the account you are viewing. Updates to the account selected in Account Name. |
Last Data Refresh / Est. Next Data Refresh | Shows how fresh the data is, in ET. |
Current Date | Today's date. |
Back to Dashboard Hub | Returns you to the Dashboard Hub. |
The controls
There are only two controls, and they apply to everything below them.
Control | What It Does | Good to Know |
Account Name | Lets customers with more than one BuildOps account (multi-tenant) filter to any one of them. | Appears on every dashboard, even if you only have one account. Multi-select: leave it blank, or select several accounts, to see them combined. |
Department Name | Narrows the page to one or more departments. | Multi-select. Narrows every tile and chart on the page, including # Jobs Completed and the three cycle-time tiles. |
There is no date filter on this page. The tiles are not limited to a period you choose. This page shows the overall picture. For period-by-period analysis, use the Finance or Operations dashboard that each tile links to.
Company Summary header and the Account Name and Department Name controls
Key Terms You'll See
New to the dashboard? Start with the first two tables. The third is a quick reference for the details.
The kinds of work
Term | What It Means |
Service Job | One-off service work, such as a repair call or a rooftop unit fix. On this dashboard, "service jobs" means non-agreement jobs: jobs that are not tied to a service agreement. |
Service Agreement (SA) | A contract for ongoing service with a customer, usually including scheduled maintenance. |
Maintenance | The scheduled maintenance work performed under a service agreement. Maintenance is counted inside service agreements. Maintenance Margin is a breakout of it, not a separate line added on top. |
Pull-through Job | A job created under a service agreement, for example a repair found during a maintenance visit. It counts with the agreement, not as a service job. |
Project | Construction project work, billed in stages through pay applications. |
Pay Application | A progress bill on a construction project, showing the work completed so far. |
Reading the numbers
Term | What It Means |
Tile / KPI | Each box on the page showing one headline number. KPI stands for key performance indicator. |
Billings (Pre-Tax) | What you have invoiced, before tax. |
Cost | What it cost to deliver the work, across all cost types: labor, material, equipment, subcontractor, and so on. |
Gross Profit | Billings minus cost. |
Gross Margin % | Gross profit as a percent of billings. |
Billing Status: Fully Invoiced / Do Not Invoice | Fully Invoiced means the job's billing is done. Do Not Invoice means the job will not be billed. Several margin tiles only count jobs with one of these two statuses, so a job's finances are complete before its margin is measured. |
Win/Acceptance Rate | The share of quotes you sent that were won (approved, or converted to a job or project). |
Labor Utilization | The share of logged labor hours that were billable. |
Job Efficiency | Budgeted hours divided by actual hours. 100% = on budget. Above 100% means the job came in under its hours. Below 100% means it took more hours than planned. |
Cycle Times | How fast work moves: created to completed (Days to Completion), last visit to completed (Closeout Efficiency), and completed to first invoice (Billing Efficiency). |
Info box (ⓘ) | Every tile has one. It shows Summary, Detail (what is included and left out), Calculation, and Source, plus a button that opens the source dashboard. |
Accounting system | Your system of record for financials, such as QuickBooks, Intacct, Vista, or Spectrum. This dashboard is not a replacement for it. |
Good to know
Term | What It Means |
Primary Quote | Only primary quotes are counted on the quote tiles and the funnel. |
Quote statuses | Approved tiles count Approved, Job Added, and Project Added. Pending counts Draft, Sent to Customer, Email Read, and Customer Viewed, including drafts that were never sent. |
Combined department label | When a job spans more than one department, it shows under a combined label with both names, such as "HVAC, Plumbing," as its own bar. |
N/A | The Maintenance Margin tile shows N/A when there are no billings to measure against. It is not an error. |
null | A tile shows null when your account does not have records that meet that tile's rules, so the calculation cannot complete. For example, if a tile only counts jobs or projects in Closed status and you have none in that status, it shows null. Open the tile's info box to see what it requires, then complete those workflows in BuildOps. |
Baseline GM | The dashed line on the Project Margin by Department chart. It marks the overall Project Margin %, the same value as the Project Margin % tile, so you can see which departments are above or below it. |
Negative cycle times | Closeout Efficiency and Billing Efficiency can be negative. A negative Billing Efficiency means the first invoice is usually created before the job is marked complete. That is billing running ahead of closeout, not an error. |
How to Use the Dashboard
Step 1: Set the header and controls
Check data freshness. Look at Last Data Refresh and Est. Next Data Refresh.
Set Account Name if your company has more than one account. Select one account to see a single office. Leave it blank, or select several, to see them combined.
Use Department Name to focus on one or more departments.
Department Name narrows every tile and chart on the page. That includes # Jobs Completed and the three cycle-time tiles.
💡 Tip: Department names appear exactly as they are entered in BuildOps. Spelling or capitalization variants, like "HVAC" and "Hvac," show up as separate departments, and jobs with a combined label are not picked up when you select just one department. If department totals look split or low, check how departments are named and assigned in BuildOps.
Step 2: Read the page from top to bottom
The page reads like a story, starting with the money and ending with how fast work moves. Here is one contractor's page, read in order.
Example (illustrative): a mechanical contractor running service, agreements, and projects
Step | What You See | What It Tells You |
1. Financial Performance | $2.4M billed, $1.6M cost, 33% gross margin | The business is profitable overall. That is the headline. |
2. Profitability by Line of Business | Service jobs 48%, SA 30%, Projects 18% | Service work is carrying the margin. Projects are the thinnest line. |
3. Project Margin by Department | HVAC and Plumbing bars sit left of the Baseline GM line | Those two departments are pulling project margin down. Start the project conversation there. |
4. Sales & Quote Pipeline | 64% win rate; most of the Pending count is drafts | Quotes win when they go out, but many are sitting unsent. |
5. Operations & Productivity | 91% utilization; Job Efficiency 85% | The team is busy on billable work, but jobs are taking more hours than budgeted. |
6. Cycle Times & Efficiency | 21 days to completion; 9-day closeout | Completed work waits over a week for paperwork before it is marked complete. |
The Five Sections
Financial Performance
What this section answers: How is the business performing financially across everything we do?
Tile | What It Shows |
Total Billings (Pre-Tax) | What you have billed, before tax. |
Total Cost | What it cost to deliver that work, across all cost types. |
Gross Profit | Billings minus cost. |
Gross Margin % | Gross profit ÷ billings, calculated on the totals. |
What is counted: finished work only. That means service jobs that are Complete or Closed, service agreements that are Active or Expired, and projects that are Work Complete or Closed. Work still in progress is not in these totals. Voided invoices are always left out.
The Total Billed Pre Tax (Dept) by Department chart breaks billings out by department, and its bars add back up to the Total Billings tile.
💡 Example (illustrative): An HVAC and plumbing contractor has $2,400,000 in Total Billings and $1,600,000 in Total Cost. Gross Profit = $800,000. Gross Margin % = $800,000 ÷ $2,400,000 = 33.3%.
💡 What to do with it: This is your early warning row. If margin is lower than you expect, use the department chart to see where billings are concentrated, then check the Profitability by Line of Business section to see which kind of work is pulling margin down.
Financial Performance tiles and the billings-by-department chart
Profitability by Line of Business
What this section answers: Which kind of work is carrying our margin?
The same question, how profitable are we, broken out by the kind of work you do.
Tile | What It Shows |
Service Job Margin % | Margin on one-off service work. Counts Complete or Closed non-agreement jobs that are Fully Invoiced or Do Not Invoice. |
SA Margin % | Margin on service agreements, including the maintenance and pull-through jobs under them. Counts Active and Expired agreements. |
Maintenance Margin % | Margin on maintenance work under an agreement. A breakout within service agreements. Shows N/A when there are no billings. |
Project Margin % | Margin on Work Complete and Closed projects. |
📝 These four margins will not add up to the Gross Margin % tile. Each one has its own rules about which jobs, agreements, or projects count, so they are not slices of the top row. Tap each tile's ⓘ to see its rules.
💡 Example (illustrative): service agreements vs. maintenance. An HVAC contractor's preventive maintenance agreements run at a 30% SA Margin. Maintenance Margin breaks out just the scheduled PM visits, so they can see whether the PM work itself or the pull-through repairs are carrying the agreements.
💡 Example (illustrative): Project Margin on closed projects. For closed projects, gross profit uses the updated contract amount instead of billings, but margin is always divided by billings. A mechanical contractor closes a project with a $100,000 contract, $90,000 billed, and $70,000 of cost. Gross profit is $100,000 − $70,000 = $30,000, and margin is $30,000 ÷ $90,000 = 33.3%. On billings alone, it would be 22.2%.
The Project Margin by Department chart shows project margin per department. The dashed Baseline GM line marks the overall Project Margin %, so departments to the right of the line are beating it and departments to the left are pulling it down.
💡 What to do with it: Use this section to decide where to focus. If service jobs run at a strong margin while projects run thin, look at project estimating and change orders. If one department sits well left of the Baseline GM line, that department's projects are where to start.
Profitability by Line of Business tiles and the Project Margin by Department chart with the Baseline GM line
Sales & Quote Pipeline
What this section answers: Are our quotes moving through the pipeline, or sitting unsent?
Tile | What It Shows |
Total Quoted Amount Approved | Dollar value of approved primary quotes. |
# Quotes Approved | How many primary quotes are approved, including those already converted to a job or project. |
# Quotes Pending | How many primary quotes are still waiting on a decision, including drafts never sent. |
Win/Acceptance Rate | Approved or converted quotes ÷ sent quotes. |
The Quote Status Funnel shows how many quotes sit in each status. Approved quotes are split across the Approved, JobAdded, and ProjectAdded bars. The # Quotes Approved tile adds all three together, which is why it is always bigger than the Approved bar on its own.
💡 Example (illustrative): A fire protection contractor's funnel shows 20 Approved, 85 JobAdded, and 15 ProjectAdded. The # Quotes Approved tile shows 120.
💡 What to do with it: A high Pending count made up mostly of drafts means quotes are being built but not sent, which is a follow-up opportunity. A falling win rate is worth a look at pricing or follow-up timing.
Sales & Quote Pipeline tiles and the Quote Status Funnel
Operations & Productivity
What this section answers: How are we using our labor, and are jobs taking longer than planned?
Tile | What It Shows |
Total Actual Labor Hours | Hours your technicians logged, from approved timesheets only. |
Avg Labor Utilization Rate | The share of those hours that were billable. Hours with no billable flag count as billable. |
Avg Job Efficiency | Budgeted hours ÷ actual hours, averaged across completed jobs. |
# Jobs Completed | Non-agreement service jobs that are completed or closed. |
💡 Example (illustrative): Labor Utilization. An electrical contractor's technicians log 4,000 hours in approved timesheets, and 3,600 of them are billable. Labor Utilization is 90%. The other 400 hours are shop time, training, and drive time flagged as non-billable.
💡 Example (illustrative): why Job Efficiency can run high. Each job gets its own ratio, and the tile averages those ratios. A plumbing job budgeted for 8 hours takes 10, which is 80%. A small job budgeted for 2 hours takes 30 minutes, which is 400%. The average is 240%, even though only one job came in under budget. A job with very few actual hours can pull the average up a lot. Use this tile as a direction, and look at the hours directly when it matters.
💡 What to do with it: Falling utilization means more of your team's time is not billable, which is worth a look at non-billable activity. Job Efficiency well below 100% means jobs are taking more hours than budgeted. Check whether estimates or field execution is the cause.
Operations & Productivity tiles
Cycle Times & Efficiency
What this section answers: How fast does work move from created, to completed, to invoiced?
Tile | What It Shows |
Avg Days to Job Completion | Average calendar days from job created to job completed. |
Avg Job Closeout Efficiency | Average days from a job's last visit ending to the job being marked complete. This is your post-visit admin time. |
Avg Job Billing Efficiency | Average days from job completed to its first invoice being created. A draft invoice counts as the first invoice. |
💡 Example (illustrative): A plumbing contractor's water heater replacement job is created March 1, its last visit ends March 5, its first invoice is created March 6, and it is marked complete March 8. Days to Completion = 7. Closeout Efficiency = 3. Billing Efficiency = −2, because billing ran ahead of closeout.
📝 Closeout Efficiency and Billing Efficiency are live, but their detail is not available in another standard dashboard yet. Their info boxes show a Coming Soon! button instead of a link.
💡 What to do with it: These are your speed metrics. A long closeout lag means completed work is waiting on paperwork. A long billing lag means cash is waiting on invoices. Shortening either one gets you paid sooner.
Cycle Times & Efficiency tiles
Tile Info Boxes: Definitions and Drill-Down
Click the ⓘ next to any tile name. The info box opens with four parts: Summary, Detail, Calculation, and Source. The green button at the bottom opens the source dashboard: Open Finance Dashboard for the money and margin tiles, and Open Operations Dashboard for most of the quote, labor, and job tiles. It takes you to the specific KPI behind the number.
💡 Tip: If you're not sure where a number comes from, open its info box. The Detail line answers most questions about what is included and what is left out.
Info box open on a tile, showing the Summary, Detail, Calculation, and Source sections and the Open Finance Dashboard button
Signals to Watch
Use this table to turn what you see on the page into a next step.
If You See... | It May Mean... | Where to Go Next |
Gross Margin % falling while billings rise | Costs are growing faster than billings. | Check each line-of-business margin, then open the Finance Dashboard from the tile's info box. |
One line-of-business margin well below the others | That kind of work is underpriced or running over cost. | That tile's info box, then the Finance Dashboard sub-tab for that line of business. |
Departments left of the Baseline GM line | Those departments' projects are below the overall project margin. | Review those departments' projects in the Projects Dashboard or the Project Analysis Dashboard. |
High # Quotes Pending, mostly drafts | Quotes are being built but not sent. | Operations Dashboard, Quotes & Recommendations page. Follow up on the drafts. |
Falling Win/Acceptance Rate | Pricing, scope, or follow-up timing may need a look. | Operations Dashboard, Quotes & Recommendations page. |
Labor Utilization dropping | More logged time is not billable. | Operations Dashboard, Labor Productivity/Utilization page. |
Job Efficiency well below 100% | Jobs are taking more hours than budgeted. | Finance Dashboard, Profitability on Completed and Closed Jobs table. Compare estimates to actuals. |
Long Closeout Efficiency | Completed work is waiting on post-visit admin. | Review your job closeout steps with the office team. |
Long Billing Efficiency | Cash is waiting on invoices after the work is done. | Review billing timing, then check the AR Aging Dashboard for what happens after invoices go out. |
Exporting and Scheduling
You can export a single tile or chart, or the whole dashboard, and set up automated recurring delivery to any email inbox.
Export a single tile or chart:
Hover over the element and click the ⋮ menu in its top-right corner.
Click Export.
Choose CSV, Excel, JSON, or PDF to download right away (1M-row limit), or choose Export... or Schedule exports... to send it by email.
Export or schedule the whole dashboard:
Click the folder icon in the bottom-left corner of the screen.
Click Export... to download the current view.
Click Schedule exports... to set up a recurring export (daily, weekly, or monthly) delivered to any email address.
💡 A weekly scheduled export of Company Summary gives leadership the same one-page read at the start of every week.
What Data Is Included (and What Isn't)
Each tile follows built-in rules about what it counts. Here's a summary:
Rule | What It Means | Why |
Finished work only (Financial Performance) | Service jobs Complete or Closed, service agreements Active or Expired, and projects Work Complete or Closed. | Keeps the money row to work that is done. |
Non-agreement service jobs | Service job tiles exclude agreement and pull-through jobs. | Those count with service agreements. |
Maintenance is counted inside service agreements | It is not a separate segment in the Financial Performance totals. Maintenance Margin is a breakout. | Avoids counting maintenance twice. |
Void invoices are always excluded | Across every tile. | They do not represent real billing. |
Draft invoices | Included for jobs and projects, excluded for service agreements. | This is how the underlying billing data is built. |
Billing status filter on margins | Service Job Margin, Maintenance Margin, and Job Efficiency only count jobs that are Fully Invoiced or Do Not Invoice. | Measures margin only when a job's finances are complete. |
Primary quotes only | Applies to all quote tiles and the funnel. | Avoids counting alternate versions of the same quote. |
Approved timesheets only | Labor tiles exclude pending, rejected, and dismissed timesheets, and entries under 0.01 hours. | Counts only confirmed time. |
No date filter | Tiles are not limited to a period. | Built as the overall picture. Period analysis lives in the detail dashboards. |
Tiles need completed workflows | A tile shows null when your account has no records that meet its rules (for example, no Closed jobs or projects). | The calculation cannot complete without qualifying records. |
⚠️ This dashboard is not a replacement for your accounting system. It reflects activity recorded in BuildOps. Use it for visibility and analysis, and use your accounting system as your system of record.
How It Fits With the Other Standard Dashboards
Company Summary is the first stop in the Dashboard Hub. It gives you the quick read, and each tile points to the dashboard with the detail.
Tiles | Where the Detail Lives |
Total Cost, Total Billings Pre Tax, Gross Margin, Gross Profit | Finance Dashboard, Profitability page |
Service Job Margin % | Finance Dashboard, Profitability page (Jobs sub-tab) |
SA Margin % | Finance Dashboard, Profitability page (Service Agreements sub-tab) |
Maintenance Margin % | Finance Dashboard, Profitability page (Maintenances sub-tab) |
Project Margin % | Finance Dashboard, Profitability page (Projects sub-tab) |
Total Quoted Amount Approved, # Quotes Approved, Win/Acceptance Rate | Operations Dashboard, Quotes & Recommendations page |
# Quotes Pending | Operations Dashboard, Quotes & Recommendations page (Quote Status Funnel). There is no direct KPI for this one; it is recompiled from the funnel. |
Total Actual Labor Hours, Avg Labor Utilization Rate | Operations Dashboard, Labor Productivity/Utilization page |
Avg Job Efficiency | Finance Dashboard, Profitability page (Profitability on Completed and Closed Jobs table) |
# Jobs Completed, Avg Days to Job Completion | Operations Dashboard, Service Jobs page |
Avg Job Closeout Efficiency, Avg Job Billing Efficiency | Not yet in another standard dashboard (coming soon) |
Not sure which dashboard to open? Use this guide:
If You're Asking... | Open... |
How is the whole business doing? | Company Summary (this dashboard) |
Which jobs or customers are behind a money or margin number? | Finance Dashboard |
Which quotes, technicians, or jobs are behind an operations number? | Operations Dashboard |
How old are our outstanding invoices? | AR Aging Dashboard. Billing Efficiency measures days to the first invoice; AR Aging measures days after billing. |
How are individual projects performing? | Projects Dashboard and Project Analysis Dashboard |
Frequently Asked Questions
Frequently Asked Questions
Q: Why isn't there a date filter?
A: Company Summary is the big-picture view, so it doesn't filter by date. For a specific period, click the tile's ⓘ and open the Finance or Operations dashboard. That's where you can look at a date range.
Q: Why doesn't the department total match what I expected?
A: Jobs that span more than one department show under a combined label, so they aren't included when you select just one department. For example, a chiller replacement split between HVAC and Plumbing shows under an "HVAC, Plumbing" bar, so selecting only HVAC does not include it. Also check for departments entered with different spellings. They show up separately.
Q: Why don't the line-of-business margins add up to Gross Margin %?
A: They're measured separately. Each one has its own rules for which jobs, agreements, or projects count, so they won't add up to the top-row margin. Tap each tile's ⓘ to see its rules.
Q: Why does Maintenance Margin show N/A, or a tile show null?
A: N/A means there are no maintenance billings to measure against. Null means your account has no records that meet that tile's rules yet. Open the tile's info box to see what it counts, for example completed, fully invoiced jobs. Once those workflows are completed in BuildOps, the number will show after the next refresh.
Q: Why is Billing Efficiency negative?
A: A negative number means your team usually creates the first invoice before the job is marked complete. Billing is running ahead of closeout. It isn't an error. For example, a fire protection contractor who invoices sprinkler inspections on site and closes the job a few days later will see a negative number.
Q: Why is # Quotes Approved bigger than the Approved bar in the funnel?
A: The tile includes quotes that were approved and then turned into a job or project. In the funnel, those sit in the JobAdded and ProjectAdded bars.
Q: Why is # Quotes Pending so high?
A: Pending includes draft quotes that haven't been sent yet, and drafts usually make up most of that number. It's a good list to follow up on.
Q: Why doesn't this match the Finance Dashboard?
A: The line-of-business margin tiles match the Finance Dashboard exactly. The top-row totals (Total Cost, Total Billings, Gross Profit, Gross Margin %) can be higher here, because they include completed jobs that haven't been fully invoiced yet, and the Finance Dashboard's equivalent totals only include Fully Invoiced and Do Not Invoice jobs. When you compare, match the account and department first, then the status rules, then the invoice rules.
Q: Why is Job Efficiency over 100%?
A: Each job gets its own efficiency ratio, and the tile averages them. A small job that took far fewer hours than budgeted can push the average well above 100%. Use it as a direction, and look at the hours directly when it matters.
Q: Why are my labor hours lower than what was clocked?
A: Only approved timesheets are counted. Pending, rejected, and dismissed time is left out. For example, if last week's timesheets are still waiting for approval, those hours won't appear until they're approved, and then only after the next refresh.
Q: Why don't these numbers match my accounting software?
A: Company Summary is an operational view built from what is recorded in BuildOps. It is not your official accounting books, and it is not a replacement for your accounting system, which remains your system of record.