Project Cost Attribute Warnings and Posting Safeguards
This update is now available to all customers. No action is required to turn it on.
We’ve added warnings and safeguards to help make sure project costs are complete and accurate before they are approved, exported, or posted.
Previously, you could create a purchase order with line items, assign a project afterward, and never be prompted for the project costing attributes: Phase, Department, Cost Code, and Cost Type. Receipts and bills created from those lines carried the same gaps, and the issue often surfaced late, at posting, resulting in incorrect project costing that had to be corrected after the fact.
Now, BuildOps flags incomplete project-related lines right away and holds back the actions that affect your financials until the missing information is filled in.
What’s new
Warnings on incomplete lines
A line is flagged when it has a Project and one or more of Phase, Department, Cost Code, or Cost Type is empty.
In line grids: A warning icon appears in each empty cell. Hover over the icon, or tab to it with your keyboard, to see what needs to be completed.
A warning icon appears in each empty cell, such as Department and Cost Code, on a line that has a project assigned.
In line edit windows: Warning text appears below each empty field and clears as soon as you fill the field in.
In the Edit Purchase Order Item window, a warning appears below each empty Phase, Department, and Cost Code field on a project-related line. You can still select Save with these fields empty, and each warning clears as soon as you fill in its field.
Generate Receipt window: The same warning icons appear on lines that are missing project costing attributes.
The Generate Receipt window flags lines that are missing project costing attributes.
Each document shows a message specific to the next step:
Purchase Order: “Complete project costing attributes before approving or exporting this purchase order.”
Receipt: “Complete project costing attributes before posting or exporting this receipt.”
Bill: “Complete project costing attributes before posting or exporting this bill.”
In the line grids, warnings display on draft and pending documents. Documents that are already exported, closed, or otherwise past draft do not show them. Lines that do not have a project are not affected and work as they did before.
Incomplete lines can still be saved
Your day-to-day work isn’t interrupted. You can save project-related lines even when some cost attributes are empty, so whoever has the costing information can complete them later. This includes technicians receiving against a purchase order.
Project-related PO lines can be saved with any of the four attributes empty. The “required field” errors and asterisks no longer appear on these fields.
Draft receipt and bill lines can also be saved while incomplete.
This also resolves an issue where some PO line amounts could not be edited because blank cost fields were locked and required.
Approve, export, and post actions are held until lines are complete
While any related project line is missing cost attributes, the following actions are disabled. Hover over a disabled action to see a message explaining what to complete.
Action | Disabled when |
|---|---|
Approve PO (only when Commitment Change Orders is enabled) | At least one project-related PO line is missing cost attributes. |
Export PO | At least one project-related PO line is missing cost attributes. |
Post Receipt | A project-related line on the receipt, or on its parent PO, is missing cost attributes. |
Post Bill | A project-related line on the bill, its parent receipt, or its parent PO is missing cost attributes. |
Once every related line has its Phase, Department, Cost Code, and Cost Type, the action becomes available again immediately, with no page reload. These checks are also enforced behind the scenes, so an incomplete document cannot be approved, exported, or posted another way.
How to complete project costing attributes
Before you begin: You need permission to edit the purchase order, receipt, or bill.
Open the document. Open the purchase order, receipt, or bill. Warning icons appear in the empty cells of the line grid.
Read the warning. Hover over a warning icon, or tab to it, to see what needs to be completed.
Check the disabled action. If Approve PO, Export PO, Post Receipt, or Post Bill is disabled, hover over it to see why.
Complete the attributes. Edit each flagged line and fill in the missing Phase, Department, Cost Code, and Cost Type. The warning under each field clears as you fill it in.
Save the line. The action updates right away.
Continue your workflow. Approve, export, or post the document.
Important: Post Receipt and Post Bill also check the related lines on the parent documents. If a parent PO line is still incomplete, these actions stay disabled even when the receipt or bill lines are complete. Complete the PO lines first, then the receipt, then the bill.
Good to know
No data is changed by this release. Existing lines with missing attributes stay as they are until someone completes them.
Lines on documents that are no longer in draft, such as exported or closed documents, are not flagged.
If the Do Not Default Project Cost Attributes setting is turned on in Procurement Settings, you may still need to enter cost attributes when creating a purchase order.
The receipt line form still requires Department.
In the receipt line edit window, warnings appear as text below the field rather than with the yellow warning icon used in the grids.